I have been busy. Moving storage unit stuff to Southport, NC. Two last loads. Table saw, router table and the planer should make one load. Several sheets of marine ply and a few sheets of other wood will make the last. My mountain bike can go in with the plywood.
In the meantime. I have been working on a few other projects.
New 8 foot florescent light to replace the 4 footers. I brought in the drill press, a couple different bench Sanders and the big band saw.
Also what other tools I thought I would need immediately. I am pleased to have the compressor set up. I really enjoy spraying finishes.
I will finish this chairs new cushion in the morning. Install a kitty door for Mary Beth in her house and then the boat upholstery starts.
I must admit to being anxious to get going on the upholstery.
I was thinking back to just over 3 years ago when I built the dinghy in this same garage.
Just off the pain pills. Could not lift much at all. I am so very much stronger now. I have come a very long ways.
So if you have been following along and have been wondering why it is taking so long? It takes longer to recover from a back injury than you might think. Those who have a back injury will corroborate this fact. But like I said, I am doing things that were not possible 3 years ago. My diligence is paying off. I feel very good about my progress.
No comments:
Post a Comment